Translation notice This language version is provided only as an auxiliary translation of the Simplified Chinese reference page. It does not constitute a separate factual source, factual determination, or legal conclusion. Translation may introduce differences in wording, terminology, or context, and company, institution, or other proper names may remain in their original form. If there is any discrepancy, ambiguity, later correction, or update, refer to the Simplified Chinese reference page and the original public source linked from it, and verify the original source before relying on the translation. View Simplified Chinese reference
Home / 四川时和新建设工程有限公司 / 记录详情
Original Simplified Chinese shown No reviewed English translation is currently available. The record remains visible so translation coverage does not hide a public record. This record page is not treated as indexable English content.
来源发布时间 2026-07-13
本站收录时间 2026-08-10
记录编号 REC-2026-76FD58D68C
Region 湖北省 / 孝感市大悟县
Source types Public notice, record or action released by an administrative authority
Summary 信息摘要 据湖北省人力资源和社会保障厅2026年7月13日公开通报,四川时和新建设工程有限公司在京港澳高速湖北段改扩建工程中拖欠67名劳动者劳动报酬共计221.24万元。2026年6月17日,大悟县人社局依法将该案移送公安机关侦办。具体内容以原始公开公告为准。